600kW/1290kWh Energy Storage System Case Study for Plastic Manufacturing Plant

June 13, 2025

Latest company case about 600kW/1290kWh Energy Storage System Case Study for Plastic Manufacturing Plant

600kW/1290kWh Energy Storage System Case Study for Plastic Manufacturing Plant

——Annual Savings: >$280K, ROI Period <3 Years

latest company case about 600kW/1290kWh Energy Storage System Case Study for Plastic Manufacturing Plant  0

1. Project Overview

Customer : XX Plastic Products Co., Ltd. (Medium-sized manufacturer in Southern China)
Industry Pain Points :



2. Solution

System Configuration :


  1. Peak-Valley Arbitrage :
    • Charge during off-peak (00:00–8:00), discharge during peak (10:00–12:00, 18:00–22:00).
    • Daily revenue : 1290kWh × $0.13 price gap = $167/day .

  2. Demand Charge Management :
    • EMS reduces peak load to <85% of transformer capacity, avoiding penalties.

  3. Backup Power :
    • Provides 30-minute emergency power during outages (prevents mold damage losses).


3. Economic Benefits

Get in touch with us
METRIC
ANNUAL VALUE
Arbitrage Revenue
$167/day × 330 =$55K
Demand Penalty Savings
$5.6K/month × 12 =$67K
Government Subsidy*
$0.11/kWh × 1290kWh × 300 cycles =$43K